SR 303L, Waddell Road to Mountain View Boulevard


ADOT – Surprise, AZ

As a subconsultant, POINT Engineers provided the final roadway, structural (walls), utility, and drainage design for this new freeway project. The project included 3.6 miles of new freeway, a new arterial roadway at greenway road, and a new bridge over Greenway Road.